ASTM STP 1129 Slurry Walls: Design, Construction, and Quality Control
ASTM STP 1129 is offered by IHS as part of an online subscription to the Special Technical Publications Library.
You may also purchase this publication alone from the IHS Standards Store.
Paul, DB
This publication contains papers presented at the Slurry Walls: Design, Construction, and Quality Control symposium held in June, 1991. The symposium was sponsored by ASTM Committee D- 18 on Soil and Rock. This publication contains four papers reflecting the state-of-the-art at the time and 26 additional papers organized under the topics Hazardous Waste, Seepage Cutoffs, and Structural.
Specific topics covered by the papers in this publication include:
- construction history
- diaphragm wall joints
- watertight joints
- construction quality control
- environmental pollution control
- slurry trench cut-off walls
- composite barrier
- trenching method
- synthetic bio-polymers
- soil pollution effects
- geotextile composite walls
- case study slurry wall as protection
- masonry building
- diaphragm wall area concerns
- cement bentonite cutoff wall
- design
- temporary foundation wall
- permanent foundation wall
- materials
- waste chemicals
- leachate containment case history
- slurry wall techniques foundation
- plastic concrete slurry
- seepage cutoff wall for dam
- thin slurry walls
- excavation support
- internally braced slurry-diaphragm wall
- instrumented slurry wall performance
- structural wall joints
- diaphragm wall joints
- deep circular diaphragm wall